Saturday, April 16, 2022

Project Log: Altburg - Townhouse II, Part 2

There's been significant work done on the house last couple of months. First I finished all the stonework and timber on the back of the model's ground floor and started to build a large chimney.
tabletop terrain
After that I finished all the textures on the right side, and with that the ground floor was finished from the outside. Still have to do the interior.
tabletop terrain
tabletop terrain
Then I started to build the upper floor.
tabletop terrain
After all the openings were done (doors and windows) I started to add timber. On this floor and the floors above I will be doing plastered walls. But that I'm leaving for later.
tabletop terrain
I also added a protruding window on one side and continued to build the chimney on the back.
tabletop terrain
tabletop terrain
After I finished all the walls on the first floor, apart from plaster, I started to move upwards. I decided to build a balcony above the main entrance supported by the series of wooden beams.
tabletop terrain
There is still a ton of work to do but the house is slowly getting the final shape.
tabletop terrain

4 comments:

  1. Love that balcony! Great flowing lines and intricate details.

    ReplyDelete
  2. Stunning work. Yours are probably the best buildings around. Congrats!

    ReplyDelete